O₂

Heat budget

Building heat, cooling demand and the thermal reserve of a liquid mass.

Heat sources

Active time is your planned operating time. Inputs must be supplied continuously while a building runs.

Heat balance

Building heat is averaged over planned operating time. Material delivery, duplicants and environmental exchange belong in the additional heat input.

Liquid heat reservoir

Material

Water · 4.179 DTU/(g·°C)

A perfectly mixed, insulated mass with constant heat input. This estimates thermal storage, not pipe conductivity, tile exchange or a room’s equilibrium.

Thermal budget

Heat input

0

kDTU / s

Heat removed

0

kDTU / s

Net heat

0

kDTU / s

Initial change per cycle

0

°C / cycle

Heat to reach target
41,790 kDTU

Balanced heat: the reservoir stays at its initial temperature.

Cooling loop