Vertical Wind Tunnel
Must be connected to a Power Source. To properly function, the area under this building must be left vacant.
Increases Duplicants Morale.
Duplicants love the feeling of high-powered wind through their hair.
Construction
- Build time
- 10 s
- Melting point
- 1,326.9 ºC
Construction materials
Plastics
1,200 kg- Specific heat
- 1.5 (DTU/g)/ºC
- Thermal conductivity
- 0.25 (DTU/(m·s))/ºC
- Heating transition
- 1,826.9 ºC
Connections
Stats
- Power use
- 1,200 W
- Self heat
- 2 kDTU/s