Priority Gas Flow
Diverts Gas to a secondary input when its primary input overflows.
Priority flows ensure important buildings are filled first when on a system with other buildings.
Automation & transport
Transport & storage
Gas
- Nominal packet mass
- 1kg
- Transport limit
- 1kg/s
- Phase-damage mass
- > 0.1 kg
Freezing or boiling damages the pipe only above this packet mass.
Construction
- Build time
- 3 s
- Melting point
- 1,326.9 ºC
Construction materials
Raw Mineral
50 kg- Specific heat
- 0.84 (DTU/g)/ºC
- Thermal conductivity
- 0.62 (DTU/(m·s))/ºC
- Heating transition
- 1,849.9 ºC