Mechanics Station

Mechanics Station

Allows the assigned Engineer to improve building production efficiency.

This building is a necessary component of the Machine Shop room.

Duplicants will only improve the efficiency of buildings in the same room as this station.

Construction

Build time
30 s
Melting point
1,326.9 ºC

Construction materials

Refined Metal

200 kg
Aluminum
Specific heat
0.91 (DTU/g)/ºC
Thermal conductivity
205 (DTU/(m·s))/ºC
Heating transition
660.3 ºC

Required by rooms