Geotuner
Increases the Temperature and output of an analyzed Geyser.
Multiple Geotuners can be directed at a single Geyser anywhere on an asteroid.
The targeted geyser receives stored amplification data when it is erupting.
Automation & transport
Transport & storage
- Storage capacity
- 0kg
Construction
- Build time
- 120 s
- Melting point
- 2,126.9 ºC
Construction materials
Refined Metal
400 kg- Specific heat
- 0.91 (DTU/g)/ºC
- Thermal conductivity
- 205 (DTU/(m·s))/ºC
- Heating transition
- 660.3 ºC
Connections
Stats
- Power use
- 120 W
- Exhaust heat
- 0.5 kDTU/s
- Self heat
- 4 kDTU/s