Fish Trap
Trapped fish will automatically be bagged for transport.
Construction
- Build time
- 10 s
- Melting point
- 1,326.9 ºC
Construction materials
Plastics
200 kg- Specific heat
- 1.5 (DTU/g)/ºC
- Thermal conductivity
- 0.25 (DTU/(m·s))/ºC
- Heating transition
- 1,826.9 ºC