Conveyor Bridge

Conveyor Bridge

Runs one Conveyor Rail section over another without joining them.

Can be run through wall and floor tile.

Separating rail systems helps ensure materials go to the intended destinations.

Automation & transport

Transport & storage

Conveyor

Nominal packet mass
20kg
Transport limit
20kg/s

An indivisible conveyor item may exceed the nominal packet mass.

Construction

Build time
30 s
Melting point
1,326.9 ºC

Construction materials

Metal Ore

400 kg
Aluminum Ore
Specific heat
0.91 (DTU/g)/ºC
Thermal conductivity
20.5 (DTU/(m·s))/ºC
Heating transition
1,083.9 ºC

Connections

Conveyor Bridge: Connections12
Footprint3 × 1 Tiles

Stats

Repair interval
-1 s

Unlocked by