O₂
Temporal Tear Opener

Buildings

Temporal Tear Opener

Infinite possibilities, with a complimentary side of meteor showers.

Spaced Out!

Construction

Build time
120 s
Melting point
2,126.9 °C

Construction materials

Metal Ore

800 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Temporal Tear Opener — Connections12
Footprint3 × 4 tiles

Related text