O₂
Atmo Suit Checkpoint

Buildings

Atmo Suit Checkpoint

A checkpoint must have a correlating dock built on the opposite side its arrow faces.

Construction

Build time
30 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

100 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Connections

Atmo Suit Checkpoint — Connections1
Footprint1 × 3 tiles

Unlocked by

1

Related text