O₂
Storage Bin

Buildings

Storage Bin

Resources left on the floor become "debris" and lower decor when not put away.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Raw Mineral / Metal Ore

400 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Related text