O₂
Conveyor Meter

Buildings

Conveyor Meter

Conveyor Meters let an exact amount of materials pass through before shutting off.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

25 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Gasket

× 1

Plastic Gasket

Plastic Gasket

Connections

Conveyor Meter — Connections12
Footprint1 × 2 tiles

Stats

2
Power use
10 W
Repair interval
-1 s

Unlocked by

1

Related text