O₂
Conveyor Loader

Buildings

Conveyor Loader

Material filters can be used to determine what resources are sent down the rail.

Construction

Build time
60 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

200 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Connections

Conveyor Loader — Connections12
Footprint1 × 2 tiles

Stats

3
Power use
120 W
Exhaust heat
0 kDTU/s
Self heat
2 kDTU/s

Unlocked by

1

Related text