O₂
Conveyor Bridge

Buildings

Conveyor Bridge

Separating rail systems helps ensure materials go to the intended destinations.

Construction

Build time
30 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

400 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Conveyor Bridge — Connections12
Footprint3 × 1 tiles

Stats

1
Repair interval
-1 s

Unlocked by

1

Related text