O₂
Shearing Station

Buildings

Shearing Station

Those critters aren't gonna shear themselves.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

400 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Shearing Station — Connections1
Footprint3 × 3 tiles

Stats

3
Power use
60 W
Exhaust heat
0.13 kDTU/s
Self heat
0.5 kDTU/s

Required by rooms

1

Unlocked by

1

Related text