O₂
Gas Intake Fitting

Buildings

Gas Intake Fitting

It's basically central-vac.

Spaced Out!

Construction

Build time
3 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

25 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Gas Intake Fitting — Connections1
Footprint1 × 1 tiles

Stats

1
Repair interval
-1 s

Unlocked by

1

Related text