Buildings
Lab Wall
- Size
- 2×3 tiles
- Build time
- 30 s
- Hitpoints
- 30
Construction
- Build time
- 30 s
- Melting point
- 1,326.9 °C
Construction materials
Raw Mineral
25 kg- Specific heat
- 0.84 DTU/g/°C
- Thermal conductivity
- 0.62 DTU/m/s/°C
- Heating transition
- 1,849.9 °C
Stats
1- Repair interval
- -1 s