O₂
Park Sign

Buildings

Park Sign

Passing through parks will increase Duplicant Morale.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

General Buildable

50 kg
Pearl
Specific heat
0.45 DTU/g/°C
Thermal conductivity
0.9 DTU/m/s/°C
Heating transition
824.9 °C

Required by rooms

2

Unlocked by

1

Related text