O₂
Oil Well

Buildings

Oil Well

Water pumped into an oil reservoir cannot be recovered.

Construction

Build time
120 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

200 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Connections

Oil Well — Connections123
Footprint4 × 4 tiles

Inputs & outputs

2
In
Water 1 kg/s
Out
Crude Oil 3.333 kg/s

Stats

3
Power use
240 W
Self heat
2 kDTU/s
Overheat temperature
2,000 °C

Unlocked by

1

Related text