Buildings
Monument Top
Building a Great Monument will declare to the universe that this hunk of rock is your own.
Construction
- Build time
- 60 s
- Melting point
- 9,725.9 °C
Construction materials
Glass
2,500 kgGlass
Glass- Specific heat
- 0.84 DTU/g/°C
- Thermal conductivity
- 1.11 DTU/m/s/°C
- Heating transition
- 1,426.9 °C
Diamond
2,500 kgDiamond
Diamond- Specific heat
- 0.516 DTU/g/°C
- Thermal conductivity
- 80 DTU/m/s/°C
- Heating transition
- 3,926.9 °C
Steel
5,000 kgSteel
Steel- Specific heat
- 0.49 DTU/g/°C
- Thermal conductivity
- 54 DTU/m/s/°C
- Heating transition
- 2,426.9 °C
Stats
1- Overheat temperature
- 2,000 °C