O₂
Monument Base

Buildings

Monument Base

The base of a monument must be constructed first.

Construction

Build time
60 s
Melting point
9,725.9 °C

Construction materials

Steel

7,500 kg

Steel

Steel
Specific heat
0.49 DTU/g/°C
Thermal conductivity
54 DTU/m/s/°C
Heating transition
2,426.9 °C

Obsidian

2,500 kg

Obsidian

Obsidian
Specific heat
0.2 DTU/g/°C
Thermal conductivity
2 DTU/m/s/°C
Heating transition
2,726.9 °C

Stats

1
Overheat temperature
2,000 °C

Unlocked by

1

Related text