O₂
Gleaner

Buildings

Gleaner

Duplicants can slather up with brackwax to increase their travel speed in transit tubes.

Construction

Build time
120 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

800 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Connections

Gleaner — Connections13
Footprint4 × 4 tiles

Inputs & outputs

7
In
Ovolene 1 kg/s
In
Brackene 1 kg/s
Out
Brine 0.81 kg/s
Out
Carbon Dioxide 0.1 kg/s
Out
Carbon Dioxide 0.1 kg/s
Out
Brackwax 0.09 kg/s
Out
Mucin 0.81 kg/s

Stats

3
Power use
480 W
Exhaust heat
0 kDTU/s
Self heat
8 kDTU/s

Forbidden in rooms

14

Unlocked by

1

Related text