O₂
Automation Ribbon Bridge

Buildings

Automation Ribbon Bridge

Wire bridges allow multiple automation grids to exist in a small area without connecting.

Construction

Build time
3 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

25 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Stats

1
Repair interval
-1 s

Unlocked by

1

Related text