O₂
Power Shutoff

Buildings

Power Shutoff

Automated systems save power and time by removing the need for Duplicant input.

Construction

Build time
30 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

100 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Power Shutoff — Connections1
Footprint1 × 1 tiles

Unlocked by

1

Related text