O₂
Radiant Liquid Pipe

Buildings

Radiant Liquid Pipe

Radiant pipes pumping cold liquid can be run through hot areas to help cool them down.

Construction

Build time
10 s
Melting point
2,926.9 °C

Construction materials

Refined Metal

50 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Stats

2
Repair interval
-1 s
Thermal conductivity
2

Unlocked by

1

Related text