O₂
Priority Liquid Flow

Buildings

Priority Liquid Flow

Priority flows ensure important buildings are filled first when on a system with other buildings.

Construction

Build time
3 s
Melting point
1,326.9 °C

Construction materials

Raw Mineral

50 kg
Ceramic
Specific heat
0.84 DTU/g/°C
Thermal conductivity
0.62 DTU/m/s/°C
Heating transition
1,849.9 °C

Connections

Priority Liquid Flow — Connections123
Footprint2 × 2 tiles

Unlocked by

1

Related text