O₂
Lead Suit Dock

Buildings

Lead Suit Dock

Lead suit docks can refill lead suits with air and empty them of waste.

Spaced Out!

Construction

Build time
30 s
Melting point
1,326.9 °C

Construction materials

Refined Metal

100 kg
Aluminum
Specific heat
0.91 DTU/g/°C
Thermal conductivity
205 DTU/m/s/°C
Heating transition
660.3 °C

Connections

Lead Suit Dock — Connections12
Footprint2 × 4 tiles

Stats

1
Power use
120 W

Unlocked by

1

Related text