Buildings
Ladder Bed
Duplicant's sleep will be interrupted if another Duplicant uses the ladder.
Spaced Out!
Construction
- Build time
- 10 s
- Melting point
- 1,326.9 °C
Construction materials
Refined Metal
200 kg- Specific heat
- 0.91 DTU/g/°C
- Thermal conductivity
- 205 DTU/m/s/°C
- Heating transition
- 660.3 °C