O₂
Gas Pump

Buildings

Gas Pump

Piping a pump's output to a building's intake will send gas to that building.

Construction

Build time
30 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

50 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Gas Pump — Connections12
Footprint2 × 2 tiles

Stats

3
Power use
240 W
Exhaust heat
0 kDTU/s
Self heat
0 kDTU/s

Forbidden in rooms

14

Unlocked by

1

Related text