Buildings
Ancient Specimen
It's not from around here.
Construction
- Build time
- 120 s
- Melting point
- 9,725.9 °C
Construction materials
Fossil
2,000 kgFossil
Fossil- Specific heat
- 0.91 DTU/g/°C
- Thermal conductivity
- 2 DTU/m/s/°C
- Heating transition
- 1,338.9 °C