O₂
Airborne Critter Bait

Buildings

Airborne Critter Bait

The type of critter attracted by critter bait depends on the construction material.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

50 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Bait

10 kg
Bleach Stone
Specific heat
0.5 DTU/g/°C
Thermal conductivity
4 DTU/m/s/°C
Heating transition
668.9 °C

Related text