O₂
Fish Trap

Buildings

Fish Trap

Trapped fish will automatically be bagged for transport.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Plastics

200 kg
Plastium
Specific heat
1.5 DTU/g/°C
Thermal conductivity
0.25 DTU/m/s/°C
Heating transition
1,826.9 °C

Related text