O₂
Fish Release

Buildings

Fish Release

A fish release must be built in liquid to prevent released fish from suffocating.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

50 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Fish Release — Connections1
Footprint1 × 3 tiles

Unlocked by

1

Related text