O₂
Fire Pole

Buildings

Fire Pole

Build these in addition to ladders for efficient upward and downward movement.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

100 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Stats

1
Repair interval
-1 s

Unlocked by

1

Related text