Buildings
Mini-Pod
A quick and easy substitute, though it'll never live up to the original.
Spaced Out!
Construction
- Build time
- 30 s
- Melting point
- 1,326.9 °C
Construction materials
Raw Mineral
50 kg- Specific heat
- 0.84 DTU/g/°C
- Thermal conductivity
- 0.62 DTU/m/s/°C
- Heating transition
- 1,849.9 °C
Stats
1- Repair interval
- 400 s