Buildings
Sick Bay
Sick bays can be placed in hospital rooms to decrease the likelihood of disease spreading.
Construction
- Build time
- 10 s
- Melting point
- 1,326.9 °C
Construction materials
Raw Mineral
200 kg- Specific heat
- 0.84 DTU/g/°C
- Thermal conductivity
- 0.62 DTU/m/s/°C
- Heating transition
- 1,849.9 °C