O₂
Dev Radiation Emitter

Buildings

Dev Radiation Emitter

That's some strong coffee.

Construction

Build time
3 s
Melting point
9,725.9 °C

Construction materials

Metal Ore

25 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Related text