O₂
Airborne Critter Trap

Buildings

Airborne Critter Trap

It needs to be armed prior to use.

Construction

Build time
10 s
Melting point
1,326.9 °C

Construction materials

Metal Ore

50 kg
Aluminum Ore
Specific heat
0.91 DTU/g/°C
Thermal conductivity
20.5 DTU/m/s/°C
Heating transition
1,083.9 °C

Connections

Airborne Critter Trap — Connections12
Footprint1 × 2 tiles

Unlocked by

1

Related text