Buildings
Portrait Canvas
Once built, a Duplicant can paint a blank canvas to produce a decorative painting.
Construction
- Build time
- 120 s
- Melting point
- 1,326.9 °C
Construction materials
Metal Ore
400 kg- Specific heat
- 0.91 DTU/g/°C
- Thermal conductivity
- 20.5 DTU/m/s/°C
- Heating transition
- 1,083.9 °C
Fibers
× 1Reed Fiber
Reed FiberStats
1- Repair interval
- -1 s